I've been on every side of a construction project. That's the advantage.

My name is Wan Azri Bin Zakaria. I'm a project controls consultant and forensic delay analyst based in Kuala Lumpur, and the Managing Director of Nexus Project Controls Sdn Bhd. Over ten years of working across the full project lifecycle — from tender programmes before a contract is signed, through baseline scheduling and progress monitoring on live projects, to forensic analysis and arbitration support after disputes arise — I've developed a perspective that pure specialists in either discipline rarely have.

Most project controls consultants have never sat across from an opposing delay expert in arbitration. Most forensic analysts haven't spent years maintaining a live programme under client pressure. I have done both. That combination shapes how I work.

The three phases

Pre-contract

My involvement on projects often starts before construction begins — preparing tender programmes, evaluating construction methodology, assessing programme risk, and building the baseline that will eventually need to hold up under scrutiny. Getting this right is not glamorous work, but it is the work that protects the project downstream.

Construction phase

Across 30+ projects as project planner and scheduler, I have built and maintained master programmes, delivered regular performance reports, prepared recovery and mitigation plans, and provided the project controls infrastructure that keeps project directors informed and capable of acting early. Sectors covered include high-rise residential, road and expressway infrastructure, water and civil works, government facilities, energy and industrial projects, and healthcare.

Post-contract

When projects end in dispute, I switch modes — from forward-looking planning to retrospective forensic analysis. I reconstruct the as-built record, apply Window Analysis methodology to identify and quantify delay events, and produce the technical analysis that supports EOT claims and arbitration proceedings. I have supported expert witnesses in 16 cases across Malaysia, Australia, and British Columbia.

The continuity across all three phases is the asset. Understanding what good project controls looks like in the construction phase is precisely what makes forensic analysis sharper in the post-contract phase.

Selected project experience

Forensic Delay Analyst / Expert Witness Support

ProjectRoleClient
Blackwater Gold Mine, British ColumbiaSupporting expert — ArbitrationContract & Commercial Resources Pty Ltd
Sarawak Coastal Road (Package 4)Supporting expert — ArbitrationCRBC (M) Holdings Sdn Bhd
City of Dreams, PenangSupporting expert — ArbitrationCRCC Malaysia Berhad
Atria DamansaraSupporting expert — ArbitrationBUCG Sdn Bhd
PJ TowerSupporting expert — ArbitrationIkhmas Jaya Sdn Bhd
KTM Double Track, Seremban–GemasSupporting expert — ArbitrationIrcon International Limited
Kajang Sewerage Pipe NetworkSupporting expert — ArbitrationSri Tinggi Solution Sdn Bhd
Damansara City HotelEOT preparationDaewoo Engineering & Construction Sdn Bhd
Public Bank Tower, Kuala LumpurEOT preparation (consolidated)Daewoo Engineering & Construction Sdn Bhd
KL Eco CityEOT preparationIreka Engineering & Construction Sdn Bhd
KLCC District Cooling Centre Phase 2EOT preparationIAQ Solution Sdn Bhd
I-City Central PlazaEOT preparation (consolidated)Persona Metro Sdn Bhd
ICON City Package 3EOT assessmentSara Timur Sdn Bhd
M-City Package 1EOT preparationKejuruteraan Asastera Sdn Bhd
Galleria 1 ApartmentEOT preparationDomain Resources Sdn Bhd
F22ACD Specialty Gas & Piping WorksEOT preparationKellington Technologies Sdn Bhd

Project Planner / Scheduler (Selected)

Project
DASH Expressway CA4
Fortescue Decarbonisation Substation Eliwana Perth (Stages 2 & 4)
Fortescue Transmission Line Eliwana Perth
MRT Multi-Storey Car Parks (Kepong & Cheras)
Oxley Tower KL
Sungai Jernih Embankment Dam, Melaka (RM130M)
Star Residence KL
River of Life Beautification (Packages 1C1D & 4A4B)
Petronas Chemical MTBE Kuantan (4D BIM)
Hospital KL Emergency Dept Upgrade (D&B)
National Sports Institute Extension, Bukit Jalil
RELA Academy, Sungai Udang, Melaka
Immigration Detention Centre, Kemayan, Pahang
Masjid Negara Conservation Phase 3

Credentials

Career timeline

2011–2014
Project planner on live projects (residential, commercial, civil) while completing Bachelor's degree at University of South Australia
2014–2016
Project planner, Suhati Sdn Bhd — programme preparation, EOT claim reports, tracking and recovery schedules
2016–2018
Planning consultant, Plus Three Consultants — specialist delay and disruption analysis, SCL Protocol methodology, expert witness assistance for arbitration proceedings
2018–present
Principal, AZ Planning Consultant — independent project controls consultancy, delay analysis, EOT preparation, expert witness support
2022–2023
Associate Director, REX C Expert & Dispute Services — construction contract dispute resolution, leading delay analysis teams, high-profile arbitration expert witness support
2023–present
Managing Director, Nexus Project Controls Sdn Bhd — specialist project controls and forensic delay analysis, HRDCorp training provider, SaaS product development
2018–present
Freelance planning specialist, RSGX Pty Ltd, Australia — project controls support for infrastructure projects including Fortescue Decarbonisation programme, Eliwana, Perth

The tech side

I'm also a builder. Most project controls consultants are not.

SiteDiary (live at constructionsitediary.com) is a construction site diary application I built and deployed solo — designed around the specific document trail that delay claims require. The stack is Laravel and React Native. The product came directly from doing forensic analysis on projects where the records weren't kept.

The XER Parser (in development) makes Primavera P6 schedule data accessible without a P6 installation. It's built on Next.js, FastAPI, and PyP6Xer — a practical tool for project controls engineers who need schedule data portable.

I work extensively with AI tools in my practice — for report drafting assistance, schedule data processing, and document analysis. I'm building the workflow and the tools that make that practical and defensible. If you're a contractor or project owner thinking about how AI and digitalisation apply to project controls and claims management, that conversation is one I can have in detail.

Working through a delay dispute, building a project controls function, or looking for training?

I work on a selective basis. Let's talk about what your project needs.